Motherwell Tank Protection | latest News

Large Breather Valve Order, over 200 items

 Despite the slowdown in the economy, Motherwell Tank Protection are enjoying their best year ever!  Sales have been boosted by a 200+ valve order for a major European client.  The main driving factor to securing the project was the ability to complete such an order in an extremely short lead time.  This shows MTP’s flexibility and strong desire to meet customer requirements

Page 4 of 14
Previous    1    2    3    4    5    6    7    8    9    10    11    12    13    Next

Thames Water Created 140m Cubic Metres Of Biogas In 2021!

Feb 2nd 2022 This milestone comes as part of the company’s plans to reach net zero by 2030, with Thames Water committing in June 2021 to lead the future of energy transition by revolutionising the way it generates and uses power. An important part of this ambition is to generate renewable power from waste....

Wimbledon Food Waste Sent For Anaerobic Digestion

Jul 29th 2021 Food waste generated at the recent Wimbledon tennis championships is to be sent to an anaerobic digestion (AD) facility, Bioenergy News reports. Kitchen waste that cannot be redistributed will be sent for AD to produce compost for agriculture and horticultural purposes....